Spotting complex sequences and logistical risks becomes a struggle when your construction schedule exists in its own silo unlinked to your 3D model. This disconnect leads to onsite disputes and inefficient resource allocation. It causes critical path delays that ripple through the entire project. HitechDigital’s 4D BIM services help you overcome this lack of clarity. We use 4D BIM modeling and link your schedule straight to the model, creating a powerful, interactive simulation of your entire construction plan.
We create a logical 4D construction sequencing plan with 4D BIM scheduling of your project. Crucially we make sure the 3D model is fully coordinated and clash free before we even start the 4D BIM sequencing. Quick detection of deviations using real-time data helps in construction project tracking and compare actual costs. We also provide a detailed 4D BIM simulation that lets your team see the entire project lifecycle, spotting risks long before they can impact the job site.
Our team of over 200 BIM professionals uses Navisworks to make sure it’s interoperable with your existing scheduling platforms, including MS Project and Primavera. Our expertise in 4D BIM in construction helps us connect these tools directly to the 3D model for data rich planning. It’s a visual, collaborative approach that builds client confidence, promotes safer construction practices and helps you make informed decisions to keep projects on track.
500,000
work hours
200+
BIM certified professionals
100+
Projects executed
10+
Years of experience
Save cost and time across every phase of your project lifecycle with precise 4D planning and scheduling.
Request Your 4D BIM Model →Streamline collaboration, improve efficiency, and keep your project on track with 4D construction scheduling.
More than 95% of our clients are recurring, a testament to the unwavering trust and satisfaction our services consistently deliver.
– Project Head, Architectural Firm, MENA Region
Use our 4D BIM solutions to track your next construction project
Helps you clearly understand project progress over a specific time period using realistic 4D simulations.
Aligns architecture, structure and MEP trades by connecting schedules to the 3D model. This reduces disagreements and delays.
Flags crucial problems with timelines and spatial interferences before construction. This makes sure you get high quality results.
Helps improve planning for equipment, labor and material conveyance, all synchronized with construction schedules.
Gives you the right visual tools to understand construction workflows. This helps clients make quick and informed decisions.
Helps your team compare actual vs planned progress. That gives you greater control over timelines and helps resolve issues faster.
Residential & Commercial
We improve construction phasing for multi-unit projects, enhance coordination between stakeholders and ensure faster handovers.
Healthcare
We coordinate customized installations for medical equipment and MEP. This means minimal confusion and precise timelines.
Educational
We guide phased construction in school and college campuses. This helps avoid disruption to studies and builds safer access.
Hotels and Resorts
We help synchronize operations across design driven spaces, improve handovers and meet schedule deadlines.
Historical Sites
We help with clear and reliable planning to preserve architectural features and manage systems and safety across restoration stages.
From Concept to Completion – Optimize Your Design and Construction Projects with Expert BIM Solutions
4D BIM adds the 4th dimension-time-to a 3D model. We embed your construction schedule directly into the model, creating a simulation that lets you see and track project progress. This helps flag logistical conflicts and coordination issues before they become costly onsite problems.
Outsourcing to a specialized team gives you immediate access to deep expertise and advanced software like Navisworks and Primavera P6. This gives you more precise, impactful scheduling at a much lower cost and faster turnaround than building that capability in house.
Virtually any construction project can benefit from 4D BIM. It’s especially valuable for complex projects, large-scale projects, or those with tight schedules where effective planning and coordination are crucial.
To get started, we’ll need a coordinated 3D BIM model and a construction timeline in a standard format. If you don’t have a 3D model, that’s not a problem. We can build one for you from existing 2D drawings or sketches.
Our 4D BIM simulation services let you see the entire construction sequence in advance. It’s a preemptive approach that helps your team flag potential logistical interferences or spatial conflicts and resolve them long before they can cause delays on site.
4D BIM can be used for both new and existing projects. For existing projects, it can help optimize renovations, expansions, or maintenance activities.
We have strict data security protocols in place to protect your confidential information. We sign non-disclosure agreements (NDAs) and use secure file-sharing platforms.
You can expect detailed BIM simulation services with clash detection reports, optimized construction schedules, and other project-specific deliverables as agreed upon.
Yes, 4D BIM scheduling directly translates into important cost savings. It prevents costly rework, onsite delays and resource allocation conflicts at every stage of your project.