Anti-Freezing thermal analysis of Hydra Device Installation

Engineering Analysis

Anti-Freezing thermal analysis of Hydra Device Installation

Scroll to Case Study

Client Profile

Manufacturer and Supplier of hydra equipment, the U.K.
Industry: Hydra equipment manufacturing industry

Objective.

The client, a leading supplier and manufacturer of hydra equipment, wanted to test the appropriate functionality of their product – an underground inline water meter. Finite Element thermal analysis carried out by Hitech FEA specialists showed observed that the water could not freeze and the meter was ‘OK’ to operate at the specified extreme climatic conditions.


Anti Freezing Thermal Analysis: Underground Pipes

Business Needs.

Challenges.

Hitech’s Solution.

Approach.

Benefit.

Client Speaks.

Our weather conditions are very extreme which caused faulty readings and hassle in the past, but Hitech’s teams helped us turn the tables.

Result.

Contact us.

Share your challenges. We will get back to you within 24 hrs.Talk to us for free consultation up to 1 hour.

Please share your information

Please share your project details

By checking this box; I understand and agree to be communicated for the said and mentioned purpose of business and/ or service provision by the domain owner.